subject
Mathematics, 27.09.2019 02:10 robert7248

Assign tasks to stations for a desired output of 500 units in a 7-hour day to balance the line using the longest operation time heuristic. break ties with the most following tasks heuristic. calculate the percentage idle time for the line. use the actual bottleneck cycle time in your calculation. (round your percentage of idle time to 2 decimal places. omit the "%" sign in your response.)

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:30, derick263
The areas of two similar triangles are 72dm2 and 50dm2. the sum of their perimeters is 226dm. what is the perimeter of each of these triangles?
Answers: 1
image
Mathematics, 21.06.2019 21:00, nanda22
Estimate the area under the curve f(x) = 16 - x^2 from x = 0 to x = 3 by using three inscribed (under the curve) rectangles. answer to the nearest integer.
Answers: 1
image
Mathematics, 21.06.2019 22:00, zakiyahjones0890
If rs 900 amounts to rs 1044 in 4 years, what sum will amount to 1368 in 3 1/2 years at the same rate
Answers: 3
image
Mathematics, 22.06.2019 01:00, isabellecannuli
Asmall book publisher knows that 26 books weigh 41 lbs. how much do 40 books weigh?
Answers: 1
You know the right answer?
Assign tasks to stations for a desired output of 500 units in a 7-hour day to balance the line using...

Questions in other subjects: