subject
Mathematics, 24.09.2019 03:30 AzuraSchaufler

If he uses upper and lower control limits of 520 and 480 hours, what is his risk (alpha) of concluding that service life is out of control when it is actually under control (type i error)?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:50, zemathes
Question b of 10which of the following describe an angle with a vertex at a? check all that applyo a. labcов. савd dooo c_baco d. zacb
Answers: 1
image
Mathematics, 21.06.2019 22:30, thelonewolf5020
Amachine that produces a special type of transistor (a component of computers) has a 2% defective rate. the production is considered a random process where each transistor is independent of the others. (a) what is the probability that the 10th transistor produced is the first with a defect? (b) what is the probability that the machine produces no defective transistors in a batch of 100? (c) on average, how many transistors would you expect to be produced before the first with a defect? what is the standard deviation? (d) another machine that also produces transistors has a 5% defective rate where each transistor is produced independent of the others. on average how many transistors would you expect to be produced with this machine before the first with a defect? what is the standard deviation? (e) based on your answers to parts (c) and (d), how does increasing the probability of an event a↵ect the mean and standard deviation of the wait time until success?
Answers: 3
image
Mathematics, 21.06.2019 23:10, izzynikkie
Which graph represents the linear function below? y-4= (4/3)(x-2)
Answers: 2
image
Mathematics, 21.06.2019 23:40, dontcareanyonemo
The function f(x) is shown in this graph the function g(x)=6x
Answers: 2
You know the right answer?
If he uses upper and lower control limits of 520 and 480 hours, what is his risk (alpha) of concludi...

Questions in other subjects:

Konu
Mathematics, 29.11.2020 01:40
Konu
Spanish, 29.11.2020 01:40
Konu
English, 29.11.2020 01:40