subject
Mathematics, 14.09.2019 08:30 Shu11

kelson sporting equipment, inc., makes two different types of baseball gloves: a regular model and a catcher's model. the firm has 900 hours of production time available in its cutting and sewing department, 240 hours available in its finishing department, and 100 hours available in its packaging and shipping department. the production time requirements and the profit contribution per glove are given in the following table:
production time (hours)
cutting packaging
model and sewing finishing and shipping profit/glove
regular model 1 1/2 1/8 $8
catcher's model 3/2 1/3 1/2 $4
assuming that the company is interested in maximizing the total profit contribution, answer the following:
a. what is the linear programming model for this problem? if your answer is zero, enter "0". if you need a negative number, enter minus sign with it. if necessary, enter the numbers as a common fraction. if the constant is "1" it must be entered in the box.
let r = number of units of regular model.
c = number of units of catcher's model.
max r + c
s. t.
r + c ≤ cutting and sewing
r + c ≤ finishing
r + c ≤ packaging and shipping
r, c ≥
b. what is the total profit contribution kelson can earn with the given production quantities? if required, round your answer to the nearest dollar.
c. how many hours of production time will be scheduled in each department? if required, round your answer to the nearest whole number.
c & s
f
p & s
c. what is the slack time in each department? if required, round your answer to the nearest whole number. if no entry is required, enter "0".
department capacity usage slack
c & s hours
f hours
p & s hours

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:20, gd9075
Which of the following describes how to translate the graph y = xi to obtain the graph of y = x - 11 - 12 1 unit left and 1 unit down 1 unit left and 1 unit up 1 unit right and 1 unit down 1 unit right and 1 unit up
Answers: 2
image
Mathematics, 21.06.2019 20:00, shayshayyy41
For what type of equity loan are you lent a lump sum, which is to be paid within a certain period of time? a. a line of credit b. equity c. a second mortgage d. an amortization
Answers: 3
image
Mathematics, 21.06.2019 22:30, jacks0292
My hour hand points between the 8 and the 9 in 35 minutes it will be the next hour. what time is it ?
Answers: 2
image
Mathematics, 21.06.2019 23:20, IDONTHAVEABRAIN
Which expression is the factorization of x^2+10+21
Answers: 3
You know the right answer?
kelson sporting equipment, inc., makes two different types of baseball gloves: a regular model and...

Questions in other subjects: