Formulate a linear programming (lp) model to solve for the earliest start and earliest finish times (in weeks above) for the above project activities. you have to include 1) variable definition 2) objective function 3) constraints 4) lp solution output from qm for windows. do not simply turn in your pert/cpm results for chart above.
ii. (50 points) formulate another linear programming (lp) model to solve for the latest start and latest finish times for this project, using the project completion time from part i above as your set target finish date. again, you have to include 1) variable definition 2) objective function 3) constraints 4) lp solution output from qm for windows.
hints on extra credit:
- problem i is to use a lp model to determine the earliest start and earliest finish times
for each activity. since earliest implies "smallest", so there must be something for you to
minimize.
- problem ii is also a lp model which involves determining the the latest start and latest
finish times for each activity. since latest implies "largest", so there must be something for you to maximize. but you must remember adding a constraint to fix the finish time (an additional variable) to the value (? weeks) you solve in the first lp model above.
- thus you need to define 4 variables for each activity i (e. g., esi, efi, lsi, lfi) to capture these timings.
- each node implies a constraint -- for instance, there must be a connection between the finish time and start time for each activity, i. e., efi > = esi + activity time(i); and each arc implies a constraint -- for instance, if there is an arc from a to c which means c can not be started until a is finished, then esc > = efa.
- the main idea is, after you use the management scientist's lp module to solve the lp models you just formulate, you are supposed to get the exact answers as what you got through pert algorithm in chapter 10 (see slide 23). if you don't get that matched up, something is wrong with your lp model formulation.
- very much common sense. also attach your printout from lp module of qm for windows when you turn the extra credit hw in.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:30, joannakawata6
Which statements are true of the graph of h(x) = ^3 square root of x-4 ? check all that apply. the domain of h(x) is the set of all real numbers. the range of h(x) is the set of all real numbers. for all points (x, h( h(x) exists if and only if x – 4 0. the graph of h(x) is a translation of f(x) down 4 units. the graph of h(x) intercepts the x-axis at (4, 0).
Answers: 1
image
Mathematics, 21.06.2019 13:00, jazare05
Officer brimberry wrote 24 tickets for traffic violations last week, but only 9 tickets this week. what is the percent decrease? give your answer to the nearest tenth of a percent.
Answers: 1
image
Mathematics, 21.06.2019 15:30, Fireburntbudder
If x + 10 = 70, what is x? a. 40 b. 50 c. 60 d. 70 e. 80
Answers: 2
image
Mathematics, 21.06.2019 18:00, warnene17
What expression is equivalent to 42x-56y
Answers: 1
You know the right answer?
Formulate a linear programming (lp) model to solve for the earliest start and earliest finish times...

Questions in other subjects:

Konu
English, 17.03.2021 23:50
Konu
Mathematics, 17.03.2021 23:50