You have determined the critical path in a cpm analysis. you would like to determine the probability of completing the project is a desired period of time. one of the activities on the critical path has an optimistic time of 5 minutes, a most likely time of 6, and a pessimistic time of 17. what is the variance estimate of this activity?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, leysirivera23ovez6n
The price of an item has been reduced by 30%. the original price was $30. what is the price of the item now ?
Answers: 1
image
Mathematics, 22.06.2019 01:30, shrinu
Marion has a bicycle that she is planning to take for a ride. the rim of the rear wheel lies 41 cm from the center of the wheel. the tire itself has a thickness of 3 cm. in order for marion to ride her bicycle 96,712 cm approximately how many rotations will the rear wheel make?
Answers: 1
image
Mathematics, 22.06.2019 01:40, twinchristiansp4xhd2
Which of the following is the major negative aspect of crossover designs for research studies? a. prohibitive cost b. residual effects c-subject drepout d. incomplete randomization e. large sample size required
Answers: 1
image
Mathematics, 22.06.2019 02:30, dchirunga23
How many degrees are there in the central angles in a circle
Answers: 1
You know the right answer?
You have determined the critical path in a cpm analysis. you would like to determine the probability...

Questions in other subjects: