Using johnson's rule for 2-machine scheduling, the sequence is: six jobs are to be processed through a two-step operation. the first operation involves sanding, and the second involves painting. processing times are as follows scheduled order job operation 1 (hours) 12 operation 2 (hours) job 10 for the schedule developed using johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation)- 51 hours (enter your response as a whole number).

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, chaparro0512
Asap i need it now choose all the answers that apply. sex-linked disorders affect males more than females affect females more than males can be carried by females, without being expressed are always expressed in males are caused by genes carried on the x and y chromosomes
Answers: 1
image
Mathematics, 21.06.2019 19:00, LoneWolves
What is x and y intercepts for y=x+7
Answers: 1
image
Mathematics, 22.06.2019 04:30, Marveon
Which of the following is the correct solution to the linear inequality shown below? y< 1/2x-4
Answers: 2
image
Mathematics, 22.06.2019 04:30, RichardKing2376
Arandom sample of 15 observations is used to estimate the population mean. the sample mean and the standard deviation are calculated as 172 and 63, respectively. assume that the population is normally distributed. a. with 99 confidence, what is the margin of error for the estimation of the population mean? b. construct the 99% confidence interval for the population mean. c. construct the 95% confidence interval for the population mean. d. construct the 83% confidence interval for the population mean. hint: you need to use excel function =t. inv.2t to find the value of t for the interval calculation.
Answers: 1
You know the right answer?
Using johnson's rule for 2-machine scheduling, the sequence is: six jobs are to be processed throug...

Questions in other subjects: