subject
Mathematics, 08.08.2019 01:30 alex43079

The tisco soft drink company has three bottling plants throughout the country bottling occurs soft drinks. the at the regional level because of the high cost of transporting bottled parent company supplies each plant with the syrup. the bottling e the syrup with carbonated soda to make and bottle the soft drinks the bottled soft drinks are then sent to regional grocery stores. th e bottling plants are treated as costs centers. the managers of the bottling plants are evaluated based on minimizing the cost per soft drink bottled and delivered. each bottling plant uses the same equipment, but some produce more bottles of soft drinks because of different demand. the costs and output for each bottling plant are: units produced 10,000,000 variable costs s 200,000 fixed costs 20,000,000 s 450,000 $1,000,000 30,000,000 s 650,000 $1,000,000 s1,000,000 required: 1. 2. estimate the average total cost per unit for each plant. why would the manager of plant a be unhappy with using the average cost as the performance measure? what is the operational leverage for each of the three bottling plants, and what does such a measure express about each location? 3.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, lala1794
Asphere has a diameter of 10 in. what is the volume of the sphere?
Answers: 1
image
Mathematics, 21.06.2019 21:50, becky1301
What function has a range {yly< 5}? question on picture above^
Answers: 3
image
Mathematics, 22.06.2019 03:00, lily0806
Point m is located at (-4, -6). what is located 4 units from point m? ( its on a coordinate plane by the way. )
Answers: 2
image
Mathematics, 22.06.2019 03:00, jdbell627
Round to the nearest ten thousandth. i dont get this
Answers: 1
You know the right answer?
The tisco soft drink company has three bottling plants throughout the country bottling occurs soft d...

Questions in other subjects: