Aproject being analyzed by pert has 38 activities, 16 of which are on the critical path. if the estimated time along the critical path is 90 days with a project variance of 25, what is the probability that the project will be completed in 88 days or less?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, Pauline3607
Use the knowledge of x- and y- intercepts to choose the correct graph of the equation 3x+6y=6
Answers: 1
image
Mathematics, 21.06.2019 17:30, Hilljos018
The length of triangle base is 26. a line, which is parallel to the base divides the triangle into two equal area parts. find the length of the segment between triangle legs.
Answers: 3
image
Mathematics, 21.06.2019 23:30, alexandramendez0616
Hich equation can pair with x + 2y = 5 to create an inconsistent system? 2x + 4y = 3 5x + 2y = 3 6x + 12y = 30 3x + 4y = 8
Answers: 3
image
Mathematics, 22.06.2019 00:00, lilacastro
The width of a rectangle is half as long as the length. the rectangle has an area of 18 square feet. what are the length and width of the rectangle?
Answers: 1
You know the right answer?
Aproject being analyzed by pert has 38 activities, 16 of which are on the critical path. if the esti...

Questions in other subjects:

Konu
Mathematics, 04.08.2020 02:01
Konu
Mathematics, 04.08.2020 02:01
Konu
Mathematics, 04.08.2020 02:01