Task time estimates for the modification of an assembly line at jim goodale's carbondale, illinois, factory are as follows: activity | time (in hours) | immediate predecessors a | 6.0 | -- b | 7.2 | -- c | 5.0 | a d | 6.0 | b, c e | 5.0 | b, c f | 7.7 | d g | 4.0 | e, f (a) draw the project network using aon. (b) identify the critical path. (c) what is the expected project length? (d) draw a gantt chart for the project.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, nayelimoormann
Turner's mom measured his room to see how long the wallpaper border needed to be. if two walls are 15 feet long and two walls are 12 feet long, how long should the strip of border be cut?
Answers: 1
image
Mathematics, 21.06.2019 20:30, kalliebjones4511
Carley bought a jacket that was discounted 10% off the original price. the expression below represents the discounted price in dollars, based on x, the original price of the jacket.
Answers: 1
image
Mathematics, 22.06.2019 01:30, bobjill1609
Sara goes on a slingshot ride in an amusement park. she is strapped into a spherical ball that has a radius 3*10^2 of centimeters. what is the volume of air in the spherical ball? use this formula: volume of a sphere=4/3pi, r^3 , where r is the sphere’s radius.
Answers: 1
image
Mathematics, 22.06.2019 07:00, andrwisawesome0
Will bought 3 college textbooks. one cost 32$, one cost 45$, and one cost 39$. what is the average price of his book?
Answers: 1
You know the right answer?
Task time estimates for the modification of an assembly line at jim goodale's carbondale, illinois,...

Questions in other subjects: