subject
Mathematics, 20.07.2019 03:20 amay1977

The world brand of rivet placement is 11209 rivets in 9 hours and belongs to j. mair of ireland. if another person places 11209 rivets in 10 hours, how long will it take both of them, if they work together, to place the 11209 rivets?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, mncampbell01
Answer asap ! the shortest path from point a to point b goes through a pond. to avoid the pond, you must walk straight 34 meters along one edge of the pond, then take a 90 degree turn, and again walk straight 41 meters along another edge of the pond to reach point b. about how many meters would be saved if it were possible to walk through the pond? a. 11 m b. 20 m c. 30.45 m d. 21.73 m
Answers: 1
image
Mathematics, 21.06.2019 18:00, ineedhelp2285
How to do this , and can some one explain
Answers: 1
image
Mathematics, 21.06.2019 19:10, teriateria
If you answer 2+2 you will get over 80 points
Answers: 2
image
Mathematics, 21.06.2019 22:30, 10121545
Which of the following circles have their centers in the third quadrant? check all that apply.
Answers: 1
You know the right answer?
The world brand of rivet placement is 11209 rivets in 9 hours and belongs to j. mair of ireland. if...

Questions in other subjects:

Konu
History, 26.03.2020 05:49