subject
Mathematics, 05.07.2019 02:10 preciadogabriel40

An estimator receives an average quote fora traffic control subcontractor of $1570 for the job duration. if the lowest bid is 4 % under average, and the highest bid is 12% above average, what is the cost difference between lowest and highest bid?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, uuuugggghhhh2463
At the beginning of the day, stock xyz opened at $6.12. at the end of the day, it closed at $6.88. what is the rate of change of stock xyz? a. 1.17% b. 11.0% c. 12.4% d. 81.5%
Answers: 1
image
Mathematics, 21.06.2019 18:30, chandranewlon
Agraphic designer created a logo on eight and a half by 11 inch paper. in order to be placed on a business card, the logo needs to be one and 7/10 inches by 2 and 1/5 in. what is the scale factor of the dilation
Answers: 1
image
Mathematics, 21.06.2019 23:00, teriateria
How can writing phrases as algebraic expressions you solve problems?
Answers: 2
image
Mathematics, 21.06.2019 23:30, maciemessing2
Drag each number to the correct location on the statements. not all numbers will be used. consider the sequence below. -34, -21, -8, 5, complete the recursively defined function to describe this sequence
Answers: 1
You know the right answer?
An estimator receives an average quote fora traffic control subcontractor of $1570 for the job durat...

Questions in other subjects:

Konu
Mathematics, 12.12.2020 16:50
Konu
Mathematics, 12.12.2020 16:50
Konu
Mathematics, 12.12.2020 16:50