subject
Mathematics, 23.09.2019 23:30 drivinghydra

With math i have the answer which is ''c'' just need an explanation on how i got the answer.
a worker takes a random sample of 200 bolts and finds that 30 of them are either too long or too short, thus making them unusable. estimate the number of unusable bolts in a production of 17,000 bolts.
a. 2,260 bolts
b. 2,140 bolts
c. 2,550 bolts
d. 1,610 bolts
i know the answer is ''c'' i just need an explanation of how to get the answer.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, kirsten8605
If the measure of angle 1 is 110 degrees and the measure of angle 3 is (2 x+10 degree), what is the value of x?
Answers: 2
image
Mathematics, 21.06.2019 19:00, doodles51
Use the quadratic formula to solve the equation. if necessary, round to the nearest hundredth. x^2 - 20 = x a. 5, 4 b. -5, -4 c. -5, 4 d. 5, -4
Answers: 2
image
Mathematics, 21.06.2019 19:30, KariSupreme
Which inequalities can be used to find the solution set of the following inequality? check all that apply. |2x – 5| (2x – 5) (2x + 5) –(2x – 5) –(2x + 5)
Answers: 1
image
Mathematics, 21.06.2019 22:40, bullockarwen
Which of the following circles have their centers on the x-axis? check all that apply.
Answers: 1
You know the right answer?
With math i have the answer which is ''c'' just need an explanation on how i got the answer.
...

Questions in other subjects: