With math i have the answer which is ''c'' just need an explanation on how i got the answer.
...
Mathematics, 23.09.2019 23:30 drivinghydra
With math i have the answer which is ''c'' just need an explanation on how i got the answer.
a worker takes a random sample of 200 bolts and finds that 30 of them are either too long or too short, thus making them unusable. estimate the number of unusable bolts in a production of 17,000 bolts.
a. 2,260 bolts
b. 2,140 bolts
c. 2,550 bolts
d. 1,610 bolts
i know the answer is ''c'' i just need an explanation of how to get the answer.
Answers: 1
Mathematics, 21.06.2019 17:30, kirsten8605
If the measure of angle 1 is 110 degrees and the measure of angle 3 is (2 x+10 degree), what is the value of x?
Answers: 2
Mathematics, 21.06.2019 19:30, KariSupreme
Which inequalities can be used to find the solution set of the following inequality? check all that apply. |2x – 5| (2x – 5) (2x + 5) –(2x – 5) –(2x + 5)
Answers: 1
Mathematics, 21.06.2019 22:40, bullockarwen
Which of the following circles have their centers on the x-axis? check all that apply.
Answers: 1
Social Studies, 13.10.2019 23:30
English, 13.10.2019 23:30
Mathematics, 13.10.2019 23:30
Biology, 13.10.2019 23:30