subject
Mathematics, 02.02.2020 21:55 mv603177

100 points

two workers finished a job in 7.5 days. how long would it take each worker to do the job by himself if one of the workers needs 8 more days to finish the job than the other worker?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:04, cathydaves
The mean temperature for the first 4 days in january was 7°c. the mean temperature for the first 5 days in january was 5°c. what was the temperature on the 5th day?
Answers: 3
image
Mathematics, 21.06.2019 16:30, RoyalGurl01
Gail is making costumes for a school play. each rabbit costume needs one and one half yards of white fur fabric, a yard of blue striped fabric, and a quarter of a yard of pink felt for the ears. g? ail needs to make eight rabbit man yards will she need, for the white fur fabric, blue striped fabric, and pink felt?
Answers: 1
image
Mathematics, 21.06.2019 21:00, itsdeevv
How many kilograms of a 5% salt solution and how many kilograms of a 15% salt solution must be mixed together to make 45kg of an 8% salt solution?
Answers: 3
image
Mathematics, 21.06.2019 23:30, Ab20600
Plzzz answer both questions and i will give you 100 points
Answers: 1
You know the right answer?
100 points

two workers finished a job in 7.5 days. how long would it take each worker to...

Questions in other subjects:

Konu
Mathematics, 05.11.2020 01:00
Konu
Mathematics, 05.11.2020 01:00
Konu
Mathematics, 05.11.2020 01:00
Konu
Mathematics, 05.11.2020 01:00