Mathematics, 02.02.2020 21:55 mv603177
100 points
two workers finished a job in 7.5 days. how long would it take each worker to do the job by himself if one of the workers needs 8 more days to finish the job than the other worker?
Answers: 1
Mathematics, 20.06.2019 18:04, cathydaves
The mean temperature for the first 4 days in january was 7°c. the mean temperature for the first 5 days in january was 5°c. what was the temperature on the 5th day?
Answers: 3
Mathematics, 21.06.2019 16:30, RoyalGurl01
Gail is making costumes for a school play. each rabbit costume needs one and one half yards of white fur fabric, a yard of blue striped fabric, and a quarter of a yard of pink felt for the ears. g? ail needs to make eight rabbit man yards will she need, for the white fur fabric, blue striped fabric, and pink felt?
Answers: 1
100 points
two workers finished a job in 7.5 days. how long would it take each worker to...
two workers finished a job in 7.5 days. how long would it take each worker to...
Mathematics, 05.11.2020 01:00
History, 05.11.2020 01:00
Mathematics, 05.11.2020 01:00
Mathematics, 05.11.2020 01:00
Health, 05.11.2020 01:00
English, 05.11.2020 01:00
Mathematics, 05.11.2020 01:00