All the members of a construction crew work at the same pace. six of them working together are able to pour foundation in 22 hours. how many hours would this job take if the number of workers increased by factor of 2?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:30, celestesanchezts
8. kelly wants to buy a magazine that is $25. later the magazine was marked up an additional 20%. what is the new price?
Answers: 1
image
Mathematics, 21.06.2019 22:30, lekepius3715
Given the system of equations presented here: 2x + 4y = 14 4x + y = 20 which of the following actions creates an equivalent system such that, when combined with the other equation, one of the variables is eliminated? multiply the second equation by â’4 to get â’16x â’ 4y = â’80 multiply the second equation by â’1 to get â’4x â’ y = â’20 multiply the first equation by 2 to get 4x + 8y = 28 multiply the first equation by â’1 to get â’2x â’ 4y = â’14
Answers: 1
image
Mathematics, 21.06.2019 23:30, dlow2243
Savannah had 40 iris blooms last year this year she had 15% more iris blooms how many more hours blooms did savannah have this year
Answers: 1
image
Mathematics, 22.06.2019 00:00, wannaoneisforever
The average length of a king cobra is 3.7 m. the record length is 1.88 m longer than the average. how long is the record holder?
Answers: 1
You know the right answer?
All the members of a construction crew work at the same pace. six of them working together are able...

Questions in other subjects:

Konu
Mathematics, 19.11.2020 07:30
Konu
Mathematics, 19.11.2020 07:30
Konu
Mathematics, 19.11.2020 07:30