Mathematics, 03.07.2019 13:00 daebreonnakelly
Shawn and ellie are construction workers. shawn can complete a concrete job in 5 hours, while ellie can complete it in 7 hours. the foreman says that it will take them 6 hours to complete it if they work together, explaining you just add the hours for each worker and divide by 2. explain each step in solving this equation, and determine if the foreman is correct or not.
Answers: 1
Mathematics, 21.06.2019 17:00, Buttercream16
The graph of f(x), shown below, resembles the graph of g(x) = x2, but it has been changed somewhat. which of the following could be the equation of f(x)?
Answers: 2
Mathematics, 21.06.2019 19:30, Victoriag2626
When 142 is added to a number the result is 64 more then 3 times the number. option 35 37 39 41
Answers: 2
Mathematics, 22.06.2019 01:00, lucyamine0
Atriangle has side lengths of x, x+11, and 3x+5. what is the perimeter?
Answers: 1
Mathematics, 22.06.2019 01:30, musfirahkhurram
Sara is flying a kite at the park. the angle of elevation from sara to kite in the sky is 53° and the length of the string is 32 feet. of sara is 5 feet tall how far off the ground is the kite
Answers: 1
Shawn and ellie are construction workers. shawn can complete a concrete job in 5 hours, while ellie...
Mathematics, 02.12.2020 21:40
Mathematics, 02.12.2020 21:40
Health, 02.12.2020 21:40
English, 02.12.2020 21:40