subject
Mathematics, 03.07.2019 18:00 reycaden

Asoda manufacturing plant manufactures 12,000 bottles of soda in an 8 hour shift. the soda produced varies directly with the hours worked. which equation can be used to determine the number of bottles produced, b, in terms of the number of hours worked, h? a) b = 1500/h b) b = 1/1500(h) c) b = 1500h d) h = 1500b

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, Geo777
Suppose a pendulum is l meters long. the time, t,in seconds that it tales to swing back and forth once is given by t=2.01
Answers: 1
image
Mathematics, 21.06.2019 19:30, sophx
Look at this pattern ; 1,4,9, number 10000 belongs in this pattern . what’s the place of this number?
Answers: 1
image
Mathematics, 21.06.2019 20:40, brayann5761
What is the value of the expression i 0 × i 1 × i 2 × i 3 × i 4? 1 –1 i –i
Answers: 2
image
Mathematics, 21.06.2019 22:00, jamarstand
What is the equation of the line that is parallel to the line with the equation y= -3/4x +1 and passes through the point (12,-12)
Answers: 1
You know the right answer?
Asoda manufacturing plant manufactures 12,000 bottles of soda in an 8 hour shift. the soda produced...

Questions in other subjects:

Konu
Computers and Technology, 11.10.2020 02:01
Konu
English, 11.10.2020 02:01