subject
Mathematics, 04.07.2019 06:30 cacaface311

Acompany has two large computers. the slower computer can send all the company's email in 45 minutes. the faster computer can complete the same job in 30 minutes. if both computers are working together, how long will it take them to do the job? do not do any rounding.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, christpress0
Given the equation y − 4 = three fourths(x + 8) in point-slope form, identify the equation of the same line in standard form. −three fourthsx + y = 10 3x − 4y = −40 y = three fourthsx + 12 y = three fourthsx + 10
Answers: 1
image
Mathematics, 21.06.2019 20:30, Knelson566
What is 140% of 25? because i need
Answers: 2
image
Mathematics, 21.06.2019 23:30, kelyanthecrafte
Astudent must have an average on five test that is greater than it equal to 80% but less than 90% to receive a final grade of b. devon's greades on the first four test were 78% 62% 91% and 80% what range if grades on the fifth test would give him a b in the course? ( assuming the highest grade is 100%)
Answers: 1
image
Mathematics, 22.06.2019 00:30, benchang3621
Find the values of the variables and the lengths of the sides of this kite.
Answers: 3
You know the right answer?
Acompany has two large computers. the slower computer can send all the company's email in 45 minutes...

Questions in other subjects:

Konu
Mathematics, 13.07.2021 23:50
Konu
Mathematics, 13.07.2021 23:50
Konu
Mathematics, 13.07.2021 23:50