subject
Mathematics, 07.07.2019 12:30 Legrand4423

An experienced carpenter could build a house in 4 days. how much would he have finished if he worked for 2 days.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:50, sweetcandy16gaming
What are the vertical asymptotes of the function f(x) =5x+5/x2 + x-2
Answers: 1
image
Mathematics, 21.06.2019 19:00, autumn8668
Stefano accidentally dropped his sunglasses off the edge of a canyon as he was looking down. the height, h(t), in meters (as it relates to sea level), of the sunglasses after t seconds, is shown in the table. during its descent, the pair of sunglasses passed by a climber in the canyon 6 seconds after stefano dropped them. to the nearest meter, what is difference in elevation between stefano and the climber? 166 meters 176 meters 230 meters 240 meters its b.176 i took the test 166 is wrong and 176 is correct
Answers: 1
image
Mathematics, 21.06.2019 20:00, carltonwashington23
The midpoints of the sides of the large square are joined to form a smaller square. what is the area of the smaller square
Answers: 1
image
Mathematics, 21.06.2019 21:30, jamarengle2
Write 5(6x+4)-2(5x-2) in the form a(bx+c) where a, b and c integers and a> 1
Answers: 1
You know the right answer?
An experienced carpenter could build a house in 4 days. how much would he have finished if he worked...

Questions in other subjects:

Konu
English, 05.11.2021 01:30
Konu
Mathematics, 05.11.2021 01:30
Konu
Mathematics, 05.11.2021 01:30
Konu
Computers and Technology, 05.11.2021 01:30