subject
Mathematics, 12.07.2019 12:00 angelteddy033

There are two machines that produce aluminum cans. the newer machine can produce 6600 cans in 220 minutes. it takes the older machine 330 minutes to produce that many cans. if the two machines work together, how long will it take them to produce 6600 cans?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:30, peytonamandac9114
Ahypothesis is: a the average squared deviations about the mean of a distribution of values b) an empirically testable statement that is an unproven supposition developed in order to explain phenomena a statement that asserts the status quo; that is, any change from what has been c) thought to be true is due to random sampling order da statement that is the opposite of the null hypothesis e) the error made by rejecting the null hypothesis when it is true
Answers: 2
image
Mathematics, 22.06.2019 00:00, sky724
When rolling 26 sided number cube what are the chances some of the role will be seven
Answers: 1
image
Mathematics, 22.06.2019 00:50, india336
To diagonalize an nxn matrix a means to find an invertible matrix p and a diagonal matrix d such that a pdp d p ap or [1 3 dh epap 3 let a=-3 -5 -3 3 3 1 step 1: find the eigenvalues of matrix a "2's" step 2: find the corresponding eigenvectors of a step 3: createp from eigenvectors in step 2 step 4 create d with matching eigenvalues.
Answers: 3
image
Mathematics, 22.06.2019 02:00, andrewblack033
Write the component forms of vectors u and v, shown in the graph, and find v − 2u. u= (< -3, -2> , < -3, -1> , < -2, -2> , < -2, -1> ) v= (< -5, 1> , -4, 0> , < 0, -4> , < 1, -5> ) v-2u= (< 5, 3> , < 0, 4> , < 4, 0> , < 5, -3>
Answers: 3
You know the right answer?
There are two machines that produce aluminum cans. the newer machine can produce 6600 cans in 220 mi...

Questions in other subjects:

Konu
English, 18.11.2020 22:20