Joe and bill are working on building a stone wall that will be 120 feet long. joe works from one end and is able to build one ten foot section in 5 hours. bill starts from the other end and is able to finish a ten foot section in 4 hours. how long will it take joe and bill to finish building the wall?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:00, gabrielar80
The paint recipe also calls for 1/4 cup of food coloring. tyler says mrs. mcglashan will also need 6 cups of food coloring. do u agree or disagree? explain.
Answers: 2
image
Mathematics, 21.06.2019 22:00, wazzuphottie1999
Iam at home. /: i am playing video games. translate the following statement into symbolic form.
Answers: 2
image
Mathematics, 21.06.2019 23:30, pradojosselinep34b1k
Find the directions in which the function increases and decreases most rapidly at upper p 0p0. then find the derivatives of the function in these directions. f(x, y)equals=x squared plus xy plus y squaredx2+xy+y2, upper p 0p0left parenthesis 1 comma negative 4 right parenthesis
Answers: 2
image
Mathematics, 22.06.2019 00:30, lazavionadams81
The nth term of a sequence in 2n-1 the nth term of a different sequence is 3n+1 work out 3 numbers that are in bothe sequences and are between 20 and 40
Answers: 2
You know the right answer?
Joe and bill are working on building a stone wall that will be 120 feet long. joe works from one end...

Questions in other subjects:

Konu
Geography, 15.02.2021 17:30
Konu
Mathematics, 15.02.2021 17:30