subject
Mathematics, 19.07.2019 12:00 Dweath50

Quick, will give ! 1. label the axis. 2. graph: a (-3, 0) b (-2, 4) c (1, -1). draw abc in blue. 3. rotate abc 90 clockwise to create  a’b’c’ in red. then list the coordinates below: formula: (x, y)  (y, -x) a(-3, 0) a’ b(-2, 4) b’ c(1, -1) c’ 4. translate a’b’c’ three units down in green. what are the coordinates of a’’b’’c’’? a” b” c”


Quick, will give ! 1. label the axis. 2. graph: a (-3, 0) b (-2, 4) c (1, -1). draw abc in blue.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:20, cody665
1- what do you think the product of a nonzero rational number and an irrational number is? is it rational or irrational? make use of variables, the closure property of integers, and possibly a proof by contradiction to prove your hypothesis.2- why do we have to specify that the rational number must be nonzero when we determine what the product of a nonzero rational number and an irrational number is? if the rational number were 0, would it give us the same result we found in the first question?
Answers: 2
image
Mathematics, 21.06.2019 23:30, hntnhtthnyt
Kerion has a beaded necklace business. she can make 12 necklaces is 2 hours. how long will it take her to make 9 necklaces?
Answers: 1
image
Mathematics, 21.06.2019 23:40, bqg464
When steve woke up. his temperature was 102 degrees f. two hours later it was 3 degrees lower. what was his temperature then?
Answers: 1
image
Mathematics, 22.06.2019 00:00, bri9263
(20 points) a bank has been receiving complaints from real estate agents that their customers have been waiting too long for mortgage confirmations. the bank prides itself on its mortgage application process and decides to investigate the claims. the bank manager takes a random sample of 20 customers whose mortgage applications have been processed in the last 6 months and finds the following wait times (in days): 5, 7, 22, 4, 12, 9, 9, 14, 3, 6, 5, 15, 10, 17, 12, 10, 9, 4, 10, 13 assume that the random variable x measures the number of days a customer waits for mortgage processing at this bank, and assume that x is normally distributed. 2a. find the sample mean of this data (x ě…). 2b. find the sample variance of x. find the variance of x ě…. for (c), (d), and (e), use the appropriate t-distribution 2c. find the 90% confidence interval for the population mean (îľ). 2d. test the hypothesis that îľ is equal to 7 at the 95% confidence level. (should you do a one-tailed or two-tailed test here? ) 2e. what is the approximate p-value of this hypothesis?
Answers: 2
You know the right answer?
Quick, will give ! 1. label the axis. 2. graph: a (-3, 0) b (-2, 4) c (1, -1). draw abc in blue....

Questions in other subjects:

Konu
Mathematics, 12.03.2021 18:40
Konu
Mathematics, 12.03.2021 18:40