subject
Mathematics, 20.07.2019 12:00 eliezer25

Each type a machine fills 400 cans per minute, each type b machine fills 600 cans per minute, and each type c machine installs 2,400 lids per minute. a lid is installed on each can that is filled and on no can that is not filled. for a particular minute, what is the total number of machines working?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, dessssimartinez6780
Name these type of angles shown check all that applies
Answers: 2
image
Mathematics, 21.06.2019 16:50, jay4881
Which undefined geometric term is described as a location on a coordinate plane that is designed by an ordered pair (x, y) ?
Answers: 1
image
Mathematics, 21.06.2019 21:00, dbajomo01
Isabel graphed the following system of equations. 2x – y = 6 y = -3x + 4 she came up with the solution (2,-2). what were the 3 steps she did to get that solution? (make sure they are in the correct order)
Answers: 2
image
Mathematics, 21.06.2019 21:30, gungamer720
Aladder that is 20ft long is leaning against the side of a building. if the angle formed between the ladder and the ground is 75 degrees how far is the bottom of the from the base of the building?
Answers: 1
You know the right answer?
Each type a machine fills 400 cans per minute, each type b machine fills 600 cans per minute, and ea...

Questions in other subjects:

Konu
Biology, 18.02.2021 22:00
Konu
Mathematics, 18.02.2021 22:00
Konu
Advanced Placement (AP), 18.02.2021 22:00