subject
Geography, 03.12.2021 17:30 Gillo34

A fast-growing town requires a new source of power. Because the town is located by a fast-flowing river, the town council votes to construct a hydroelectric power plant. This requires a dam to be built. How might this activity affect the local watershed? The hydroelectric plant will likely flood the area behind the dam that is constructed.
The hydroelectric plant will likely pollute the water flowing down the waterfall.
The hydroelectric plant will likely pollute the air above the waterfall, leading to acid rain.
The hydroelectric plant will likely quit operating in the summer when the river dries up.

ansver
Answers: 1

Other questions on the subject: Geography

image
Geography, 21.06.2019 18:30, josephaciaful
What was the primary purpose of the sibley commission in georgia? question 5 options: to schools across georgia integrate peacefully to discover how georgians felt about the issue of integration to lead non-violent protests to elect new civil rights leaders
Answers: 1
image
Geography, 22.06.2019 01:20, moore7165
Atsunami usually is the result of a. a nearby underwater earthquake. b. the winter monsoons. c. seismic activity in the eastern pacific ocean. d. hurricane-force winds.
Answers: 1
image
Geography, 22.06.2019 11:30, ahhhhhhhh5509
Which statements are accurate about snow flakes
Answers: 2
image
Geography, 22.06.2019 22:10, Eltravieso
India's population is made up of percent hindus.
Answers: 1
You know the right answer?
A fast-growing town requires a new source of power. Because the town is located by a fast-flowing ri...

Questions in other subjects:

Konu
Mathematics, 04.12.2019 01:31