subject
Engineering, 14.03.2022 14:00 gungamer720

In an operating system the scheduler perform the task of assigning ___processes to ___

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, tobyhollingsworth178
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
image
Engineering, 06.07.2019 03:10, tyheath42
Steel balls 12 mm in diameter are annealed by heating to 1150 k and then slowly cooled to 400 k in an air att 325 k and h -20 w/m2 k. assume the properties of the steel to be k- 40 w/m k, p 7800 kg/m3, and cp 600 j/kg k. a. determine whether lumped system method can be used to analyze this problem and if so why" b. determine the time required for the cooling process. c. determine the total amount of heat lost from each ball to the ambient air
Answers: 1
image
Engineering, 06.07.2019 03:20, leapfroggiez
An air-conditioning system consists of a heating section and an evaporative cooler. air enters the heating section at 10°c and 70 percent relative humidity at a rate of 30m^3/min, and it leaves the evaporative cooler at 20°c and 60 percent relatively humidity. if the air conditioning system operates at a total pressure of 98 kpa, determine (a) the temperature and relative humidity of the air when it leaves the heating section, (b) the rate of heat transfer in the heating section, and (c) the rate of water added to air in the evaporative cooler
Answers: 2
You know the right answer?
In an operating system the scheduler perform the task of assigning ___processes to ___...

Questions in other subjects:

Konu
Mathematics, 18.09.2021 17:50