subject
Engineering, 18.02.2022 07:30 thebrain1345

Why might construction crews want to install pipes before the foundation is poured? Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.
Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.

Pipes form an important component of the structural integrity of a foundation.
Pipes form an important component of the structural integrity of a foundation.

Plumbing must feed into municipal water and sewer lines buried below the foundation.
Plumbing must feed into municipal water and sewer lines buried below the foundation.

All utilities, including electrical and HVAC, are installed before the foundation is laid.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, brooklyn674
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
image
Engineering, 04.07.2019 18:20, myahlit84
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:20, DroctorWellsfan
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
image
Engineering, 04.07.2019 19:20, mariahmimibrooks
Liquid flows at steady state at a rate of 2 lb/'s through a pump, which operates to raise the elevation of the liquid 100 ft from control volume inlet to exit. the liquid specific enthalpy at the inlet is 40.09 btu/lb and at the exit is 40.94 btub. the pump requires 3 btu/s of power to operate. if kinetic energy effects are negligible and gravitational acceleration is 32.174 tt/s, the heat transfer rate associated with this steady state process is most closely 1)-2,02 btu/s from the liquid to the surroundings 2)-3.98 btu/s from the surroundings to the liquid. 3)-4.96 btu/s from the surroundings to the liquid. 4)-1.04 btu/s from the liquid to the surroundings.
Answers: 2
You know the right answer?
Why might construction crews want to install pipes before the foundation is poured? Plumbing crews...

Questions in other subjects:

Konu
Mathematics, 16.04.2020 06:43
Konu
Mathematics, 16.04.2020 06:43
Konu
Mathematics, 16.04.2020 06:44