Engineering, 25.01.2022 14:00 shelbylynn17
This task requires you to produce a partial estimate for a residential project. The estimate isto be prepared for use in a tender process and must include all preliminary and site costs. Your estimate should be based on determining detailed costs for three major trades. TheseCould include bricklayers, carpenters, painters, plumbers or electricians. If you are unsureWhether the trade you have chosen is considered as a major trade, ask your assessor forAdvice. In preparing the estimate, you must:
Answers: 2
Engineering, 03.07.2019 14:10, aliceohern
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
Engineering, 04.07.2019 18:10, winterblanco
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
Engineering, 04.07.2019 18:20, esmemaluma00
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
Engineering, 04.07.2019 18:20, sanchez626
Aheavily insulated piston-cylinder device contains 0.02 m3 of steam at 300 kpa and 200 °c. 1.2 mpa. d this process. team is now compressed in a reversible manner to a pressure of etermine the entropy change and the work done on the steam during this process
Answers: 1
This task requires you to produce a partial estimate for a residential project. The estimate isto be...
Mathematics, 20.03.2020 06:22