A front end loader has an output of 200 BCY of earth per hour. It loads a fleet of 3 trucks (capacity of 18 LCY each). The trucks haul the earth to a fill where it is compacted with a shrinkage factor of 10%. Each truck has a total cycle time of 15 minutes, assuming no delays. The earth has a swell of 20%. The job requires 18,000 CCY. How many hours are required to excavate and haul the material to the fill

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, jadeochoa4466
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, ayoismeisjjjjuan
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
You know the right answer?
A front end loader has an output of 200 BCY of earth per hour. It loads a fleet of 3 trucks (capacit...

Questions in other subjects:

Konu
Chemistry, 17.06.2021 03:50
Konu
Mathematics, 17.06.2021 03:50