![subject](/tpl/images/cats/User.png)
Engineering, 27.10.2021 01:00 tonimgreen17p6vqjq
If something went wrong in the Rockwell hardness test, What would be the reason? PLEASEEE HELP
![ansver](/tpl/images/cats/User.png)
Answers: 3
![](/tpl/images/ask_question.png)
![](/tpl/images/ask_question_mob.png)
Other questions on the subject: Engineering
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
If something went wrong in the Rockwell hardness test, What would be the reason?
PLEASEEE HELP...
Questions in other subjects:
![Konu](/tpl/images/cats/en.png)
English, 05.01.2020 05:31
![Konu](/tpl/images/cats/istoriya.png)
![Konu](/tpl/images/cats/istoriya.png)
![Konu](/tpl/images/cats/obshestvoznanie.png)
Social Studies, 05.01.2020 05:31
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/obshestvoznanie.png)
Social Studies, 05.01.2020 05:31
![Konu](/tpl/images/cats/mat.png)
Mathematics, 05.01.2020 05:31
![Konu](/tpl/images/cats/istoriya.png)
History, 05.01.2020 05:31
![Konu](/tpl/images/cats/mat.png)
Mathematics, 05.01.2020 05:31