The agency CM is managing a contract that installs interior finish work for an underground pedestrian tunnel. The concrete tunnel shell was constructed under another contract over a year ago. The shell contract specified embeds in the cast-in-place ceiling for hanging all-thread to support chilled water pipes. The finishes contractor has discovered that only expansion anchors were installed, which will not support the pipe weight. He proposes a costly change to retrofit embeds using epoxy. The CM learns that the tunnel shell designer approved the shell contractor's submittal for the expansion anchors. Which of the following is the CM's best course of action? a. Contact the shell designer to design and contract for the repair based on the submittal approved in error.
b. Ask a third party task order contractor to design and install the retrofit with back charge to the shell contractor and shell designer in proportion to their contract dollar values.
e. Issue a change order to the finishes contractor for the epoxy embeds. Seek to recover from the designer or shell contractor.
d. Contact the shell contractor to do the retrofit based on a latent defect.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, colin774
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 19:20, holaadios222lol
Apiping systems consists of 6 m of 6-std type k and 12 m of 4-std type k, both drawn copper tubing. the system conveys ethylene glycol at a rate of 0.013 m3/s. the pressure drop across the system is to be calculated. there are two 90° elbows in the 6-in pipe, a reduction from the 6-in pipe to the 4-in pipe and four 90° elbows in the 4-in pipe. all fittings are soldered (same as flanged) and regular. the inlet and outlet of the system are at the same height.