subject
Engineering, 07.10.2021 14:00 Luciano3202

which of the following is an example of the successful implementation of the system of checks and balances?

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, settasav9641
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
image
Engineering, 04.07.2019 19:20, nikkiebartels
Afan that can provide air speeds up to 60 m/s is to be used in a low-speed wind tunnel with atmospheric air at 35 c. if one wishes to use the wind tunnel to study flat-plate boundary layer behavior up to reynolds numbes of re 10, what is the minimum plate length that should be used? at what distance from the leading edge would transition occur if the critical reynolds nurnber were rer, e = 5 × 105?
Answers: 2
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 05.07.2019 10:10, johns2380
What is the correct way to measure the overall length of a boat? measure from the tip of the bow to the highest point on the gunwale. measure from the tip of the bow in a straight line to the stern of the boat. measure from the tip of the bow in a straight line to the back seat. measure from port to starboard at the boat's widest point.
Answers: 1
You know the right answer?
which of the following is an example of the successful implementation of the system of checks and ba...

Questions in other subjects:

Konu
Mathematics, 22.12.2020 18:20
Konu
Health, 22.12.2020 18:20