subject
Engineering, 04.10.2021 14:00 perezsharisse24

An engine is disassembled after low miles and a recent overhaul because of smoking. during the engine disassembly, it is noticed that many of the crankshaft bearings have localized (in one area of each bearing) spots of wear. Technician A says that this is a normal condition for an overhauled engine. Technician B says the localized wear could be due to dirt that was left on the main bearing saddles during the recent overhaul. Who is correct?

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, DroctorWellsfan
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 05.07.2019 23:20, neisha2507
Which one of the following faults cause the coffee in a brewer to keep boiling after the brewing cycle is finished? a. an open circuit in the heating element b. a short circuit at the terminals c. welded contacts on the thermostat d. a leak around the gasket
Answers: 3
You know the right answer?
An engine is disassembled after low miles and a recent overhaul because of smoking. during the engin...

Questions in other subjects:

Konu
Mathematics, 17.04.2020 02:58
Konu
History, 17.04.2020 02:58
Konu
Mathematics, 17.04.2020 02:58