subject
Engineering, 16.09.2021 14:00 demarcuswiseman

Upon examination of an engine that will not start after a complete overhaul, the technician finds that both the intake and exhaust valves are open at the same time when the piston is 1" (2.34cm) past TDC on the intake stroke. Technician A says this phenomenon is valve overlap and could not be the cause of the engine not starting. Technician B says the camgear is not properly indexed with the crankgear. Which technician is correct? Technician A
Technician B
Both Technician A and B
Neither Technician A or B

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, volleyballfun24
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
image
Engineering, 04.07.2019 19:20, littlepotato10
To save energy, the air supply to a 2000 ft office has been shut off overnight and the room temperature has dropped to 40°f. in the morning, the thermostat is reset to 70°f and warm air at 120 f begins to flov in at 200ft'/min. the air is well mixed within the room, and an equal mass flow of air at room temperature (changing with time) is withdrawn through a return duct. the air pressure is nearly 1 atm everywhere. ignoring heat transfer with the surroundings and kinetic and potential energy effects, estimate how long it takes for the room temperature to reach 70°f. plot the room temperature as a function of time.
Answers: 1
image
Engineering, 04.07.2019 19:20, lordcaos066
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
image
Engineering, 06.07.2019 04:10, 25linm
Water flows at the rate of 200 i/s upwards through a tapered vertical pipe. the diameter at marks(3) clo5) the bottom is 240 mm and at the top 200 mm and the length is 5m. the pressure at the bottom is 8 bar, and the pressure at the topside is 7.3 bar. determine the head loss through the pipe. express it as a function of exit velocity head.
Answers: 3
You know the right answer?
Upon examination of an engine that will not start after a complete overhaul, the technician finds th...

Questions in other subjects:

Konu
Mathematics, 20.09.2020 03:01