subject
Engineering, 12.09.2021 06:20 maylasia

The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be 1.2. If the benefit is estimated at $520,000 per year and the maintenance cost is expected to total $320,000 per year, what is the allowed maximum initial cost of the project? The discount rate is 6.5% per year and a project life of 40 years is expected.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, margaret1758
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
image
Engineering, 03.07.2019 15:10, theamandawhite
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
You know the right answer?
The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be...

Questions in other subjects:

Konu
Mathematics, 23.08.2021 22:00
Konu
Mathematics, 23.08.2021 22:00