Engineering, 12.09.2021 06:20 maylasia
The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be 1.2. If the benefit is estimated at $520,000 per year and the maintenance cost is expected to total $320,000 per year, what is the allowed maximum initial cost of the project? The discount rate is 6.5% per year and a project life of 40 years is expected.
Answers: 3
Engineering, 03.07.2019 15:10, margaret1758
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
Engineering, 03.07.2019 15:10, theamandawhite
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be...