Eric is doing measurements to build a quote for a residential heating system installation hes discovered amount of x of heat loss from ventilation and amount y from infiltration what number should he use for his calculations a. The average of x and y
b. the difference between x and y
c. whichever is greater, x or y
d. the sum of x and y

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 19:10, nayi2002
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 04.07.2019 19:20, lordcaos066
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
You know the right answer?
Eric is doing measurements to build a quote for a residential heating system installation hes discov...