Engineering, 27.08.2021 16:40 supertailsninja453
A worker-machine operation was found to involve 3.3 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker’s time averaged 1.9 minutes per cycle, and the worker was given a rating of 120 percent (machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 12 percent of work time, determine the standard time for this job.
Answers: 1
Engineering, 04.07.2019 19:10, lexie223
Acircular aluminum shaft mounted in a journal is shown. the symmetric clearance gap between the shaft and journal is filled with sae 10w-30 oil at t 30°c. the shaft is caused to turn by the attached mass and cord. develop and solve a differential equation for the angular speed of the shaft as a function of time.
Answers: 2
Engineering, 06.07.2019 02:30, chickennbutt0730
On solidification from a melt, the polymer polyethylene forms a semi-crystalline spherulite structure. (i) sketch an individual spherulite and label the amorphous and crystalline regions. (ii) draw a schematic to show the changes in specific volume with temperature during cooling from the melt, comparing it to the theoretical extremes of fully crystalline and fully amorphous (indicate tm and tg)
Answers: 2
Engineering, 06.07.2019 04:10, j015
Apinion having 30 involute teeth of 6,5 module rotates at 220 r/min and transmits 2 kw to a gear wheel having 70 teeth; the addendum on both wheels is 4 of the circular pitch and the angle of obliquity is 200. determine; 3.1 the lengths of the path of approach and the arc of approach 3.2 the normal force between the teeth at an instant when there is only one pair of teeth in contact
Answers: 2
A worker-machine operation was found to involve 3.3 minutes of machine time per cycle in the course...
English, 17.06.2020 11:58
Mathematics, 17.06.2020 11:58
Mathematics, 17.06.2020 11:58
Social Studies, 17.06.2020 11:58