subject
Engineering, 30.07.2021 09:50 xcji7384

Suppose a contract states that the designer should bear the responsibility if substantial differences were found between the design drawings and the reality. What type of disagreement may happen due to this statement? Select one: a. Disagreement about the definition of concepts and terminology
b. Disagreement about irrelevant facts
c. Disagreement about unknown facts
d. Disagreement about the definition of facts​

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, myahlit84
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 19:10, nani3906
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
image
Engineering, 04.07.2019 19:20, sashajayne8260
Determine the stoichiometric and actual air-fuel ratios and the mole flue gas composition for combustion with 15% excess air for raw indiana, pennsylvania raw coal.
Answers: 3
image
Engineering, 04.07.2019 19:20, brae72
Asimple speed reducer is composed of 2 spur gears. the pinion gear has a pitch diameter of 0.75" and 36 teeth while the driven gear has a pitch diameter of 4.0" and 192 teeth. a)-what is the diametral pitch of each gear? b)-if an electric motor rotating ccw at 3000 rpm is coupled to the pinion, what is the rotational speed of the driven gear? c)-if the torque delivered to the pinion is 1 n-m, what is the torque on the driven gear? d)-what is the power transmitted by the gear train?
Answers: 1
You know the right answer?
Suppose a contract states that the designer should bear the responsibility if substantial difference...

Questions in other subjects:

Konu
Mathematics, 25.03.2020 05:25
Konu
Biology, 25.03.2020 05:25