Engineering, 07.07.2021 02:30 lxlie2315
Technician A says that the purpose of the Pre-Delivery Service is to inspect and identify any
problems prior to the vehicle's delivery to the customer and to verify that the vehicle is
functionally and visually ready for delivery to the customer.
Technician B says that the Pre-Delivery Service is performed based upon the standards
published in a Pre-Delivery Service Bulletin specific to each vehicle model and model year.
Who is right?
Answers: 1
Engineering, 04.07.2019 18:10, yasminothman02
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
Engineering, 04.07.2019 18:10, oshawn108
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg. k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m. k
Answers: 2
Technician A says that the purpose of the Pre-Delivery Service is to inspect and identify any
probl...
Geography, 11.09.2019 18:30
Biology, 11.09.2019 18:30
English, 11.09.2019 18:30
Mathematics, 11.09.2019 18:30
Computers and Technology, 11.09.2019 19:10