subject
Engineering, 04.07.2021 14:00 dakshshberry

-The CNC Lathe is scheduled to run for an 8 hour shift. The normal shift includes total of 45 minute meal breaks. During the shift the Machine experiences 60 minutes of unscheduled downtime. The Planned Rate for the part being produced is 40 Units/Hour or 250 part per shift. The Machine produced 242 Total Units during the shift. The Good Units produced in that shift are 230 good units. Calculate the OEE. the subject is quality control

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, volleyballfun24
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
image
Engineering, 04.07.2019 18:20, mjcbs21
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
image
Engineering, 04.07.2019 18:20, rbgrh9465
An open feedwater heater operates at steady state with liquid entering at inlet 1 with t? = 40°c and pl = 1 .2 mpa. water vapor att2-200°c and p2 = 1.2 mpa enters at inlet 2. saturated liquid water exits with a pressure of pa 1.2 mpa. neglect heat transfer with the surroundings and all kinetic and potential energy effects, determine the mass flow rate of steam at inlet 2 if the mass flow rate of liquid water at inlet 1 is given as 2 kg/s.
Answers: 3
You know the right answer?
-The CNC Lathe is scheduled to run for an 8 hour shift. The normal shift includes total of 45 minute...

Questions in other subjects:

Konu
Mathematics, 23.02.2021 22:00
Konu
Mathematics, 23.02.2021 22:00
Konu
Mathematics, 23.02.2021 22:00