Engineering, 16.06.2021 05:40 presasjenifer1

Which phase of project development provides engineers with an opportunity to determine the gaps or problems of the project on paper? design

testing

requirements gathering

implementation: develop and build

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
image
Engineering, 04.07.2019 18:10, keigleyhannah30
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
image
Engineering, 04.07.2019 18:20, 21megoplin
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
image
Engineering, 04.07.2019 19:10, thawkins79
Agas contained within a piston-cylinder assembly e end nation about same energy states, 1 and 2, where pi 10 bar, v undergoes two processes, a and b, between the sam 0.1 m3, ui-400 kj and p2 1 bar, v2 1.0 m2, u2 200 kj: process a: process from 1 to 2 during which the pressure- volume relation is pv constant process b: constant-volume process from state 1 to a pressure of 2 bar, followed by a linear pressure-volume process to +20 0 state 2 kinetic and potential energy effects can be ignored. for each of the processes a and b, (a) sketch the process on p-v coordinates, (b) evaluate the work, in kj, and (c) evaluate process the heat transfer, in kj
Answers: 2
You know the right answer?
Which phase of project development provides engineers with an opportunity to determine the gaps or p...

Questions in other subjects:

Konu
Mathematics, 14.10.2019 19:30