subject
Engineering, 14.06.2021 15:20 173899

It is a well-known principle that the engineer should not tell the contractor how to do the work; but, if the engineer observes that the contractor’s construction methods appear to be unable to meet the specifications. Required:
What should the engineer do?

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, johnthienann58
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
image
Engineering, 04.07.2019 18:10, selenamr
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed. gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
image
Engineering, 04.07.2019 18:10, tobyhollingsworth178
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
image
Engineering, 04.07.2019 18:20, CelesteN64
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
You know the right answer?
It is a well-known principle that the engineer should not tell the contractor how to do the work; bu...

Questions in other subjects:

Konu
Mathematics, 05.05.2020 23:35