4 An approach to a pretimed signal has 30 seconds of effective red, and D/D/1 queuing holds. The total delay at the approach is 83.33 veh-s/cycle and the saturation flow rate is 1000 veh/h. If the capacity of the approach equals the number of arrivals per cycle, determine the approach flow rate and cycle length.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, myahlit84
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:20, 21megoplin
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
image
Engineering, 04.07.2019 18:20, rbgrh9465
An open feedwater heater operates at steady state with liquid entering at inlet 1 with t? = 40°c and pl = 1 .2 mpa. water vapor att2-200°c and p2 = 1.2 mpa enters at inlet 2. saturated liquid water exits with a pressure of pa 1.2 mpa. neglect heat transfer with the surroundings and all kinetic and potential energy effects, determine the mass flow rate of steam at inlet 2 if the mass flow rate of liquid water at inlet 1 is given as 2 kg/s.
Answers: 3
image
Engineering, 04.07.2019 19:10, Calliedevore
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
You know the right answer?
4 An approach to a pretimed signal has 30 seconds of effective red, and D/D/1 queuing holds. The tot...

Questions in other subjects:

Konu
Mathematics, 06.05.2021 19:20
Konu
Mathematics, 06.05.2021 19:20