subject
Engineering, 25.05.2021 02:30 famouzgal

Multiple Choice You work for a large engineering design firm that receives a contract to build a new multi-level sports and fitness complex. It’s a lucrative contract, but the hitch is that the project must be completed on a tight time frame with no cost overruns. In this situation, which of the following might your company do to best advantage?

A. Assign a single team to the project and involve the contractors as part of the in-house team.

B. Do the design work in-house and then have the design team contract out the construction work to the lowest bidder, to be managed by a team the contractor assembles.

C. Assign separate teams to the design phase, choose the best design, and then contract out construction to the bidder that best balances low cost with high qualifications.

D. Do the design work in-house and then have the design team contract out the construction work to the bidder with the best qualifications, to be managed by a team the contractor assembles.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, yasminothman02
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
image
Engineering, 04.07.2019 18:10, winterblanco
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:10, genyjoannerubiera
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
Multiple Choice You work for a large engineering design firm that receives a contract to build a ne...

Questions in other subjects:

Konu
Mathematics, 11.12.2021 14:00
Konu
Computers and Technology, 11.12.2021 14:00
Konu
Mathematics, 11.12.2021 14:00
Konu
History, 11.12.2021 14:00
Konu
English, 11.12.2021 14:00