subject
Engineering, 18.05.2021 18:40 isamar7342

A four-lane divided multilane highway (two lanes in each direction) in rolling terrain has five access points per mile and 11-ft lanes with a 4-ft shoulder on the right side and a 2-ft shoulder on the left. The peak-hour factor is 0.84 and the traffic stream consists of 6% trucks, 4% buses, and 3% recreational vehicles. The driver population adjustment factor is estimated at 0.90. If the analysis flow rate is 1250 pc/h/ln, what is the peak-hour volume

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
image
Engineering, 04.07.2019 19:10, pedropaulofpedrosapp
Tom is having a problem with his washing machine. he notices that the machine vibrates violently at a frequency of 1500 rpm due to an unknown rotating unbalance. the machine is mounted on 4 springs each having a stiffness of 10 kn/m. tom wishes to add an undamped vibration absorber attached by a spring under the machine the machine working frequency ranges between 800 rpm to 2000 rpm and its total mass while loaded is assumed to be 80 kg a) what should be the mass of the absorber added to the machine so that the natural frequency falls outside the working range? b) after a first trial of an absorber using a mass of 35 kg, the amplitude of the oscillation was found to be 10 cm. what is the value of the rotating unbalance? c) using me-3.5 kg. m, find the optimal absorber (by minimizing its mass). what would be the amplitude of the oscillation of the absorber?
Answers: 3
image
Engineering, 04.07.2019 19:10, kayleeemerson77
Analyze the factors that influence the choice between the following pairs of processes to make the products indicated: i) sand casting versus die casting of an electric-motor housing ii) thread rolling versus machining of a bolt for high-strength application. (co3/c5)
Answers: 3
image
Engineering, 06.07.2019 02:30, onlymyworld27
In a unit cell of fcc structure, indicate the position of one of the tetrahedral interstitial sites by plotting the corresponding tetrahedron. do the same for one of the octahedral interstitial sites (in a separate fcc unit cell). mark the positions of all the tetrahedral and octahedral interstitial sites in the unit cells. how many equivalent tetrahedral sites and how many equivalent octahedral sites are contained in a fcc unit cell, respectively. what is the coordination number for a tetrahedral site and what is the coordination number for an octahedral site?
Answers: 2
You know the right answer?
A four-lane divided multilane highway (two lanes in each direction) in rolling terrain has five acce...

Questions in other subjects:

Konu
Chemistry, 12.11.2020 22:30
Konu
Arts, 12.11.2020 22:30
Konu
Mathematics, 12.11.2020 22:30