subject
Engineering, 07.05.2021 03:20 jazprincezz7606

The design of a concrete mix requires 1173 kg/m3 of gravel in dry condition, 582 kg/m3 of sand in dry condition, and 157 kg/m3 of free water. The gravel available at the site has a moisture content of 0.9% and absorption of 1.5%, and the available sand has a moisture content of 1.2 and absorption of 1.5%. What are the masses of gravel, sand, and water per cubic meter that should be used at the job site

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, leomessifanboy678
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
image
Engineering, 04.07.2019 18:20, luisgonz5050
Find the kinematic pressure of 160kpa. for air, r-287 j/ kg k. and hair al viscosity of air at a temperature of 50°c and an absolute (10 points) (b) find the dynamic viscosity of air at 110 °c. sutherland constant for air is 111k
Answers: 3
image
Engineering, 04.07.2019 18:20, rhussein6452
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
image
Engineering, 04.07.2019 19:10, pjgolden04
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
You know the right answer?
The design of a concrete mix requires 1173 kg/m3 of gravel in dry condition, 582 kg/m3 of sand in dr...

Questions in other subjects: