Given that there are approximately 12 no. 1 1/4 inch (internal diameter) steel pipes; a) Determine the effective length of the pipes to the wet areas given that the required pressure is 39.24kPa at a discharge flow rate of 0.001 m/s.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 19:30, 10040813
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
image
Engineering, 04.07.2019 18:20, cdyshaylia55
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
image
Engineering, 04.07.2019 19:20, qurreab26
A5 kg block of fe is dropped into a very large vat of water. the fe and water initial temperatures are 95 and 25 c, respectively. the fe final temperature is 25 c and the water can be treated as a thermal reservoir,. treated as a thermal reservoir take the water to be the system and determine the entropy generation. report vour answer in kj/k.
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
Given that there are approximately 12 no. 1 1/4 inch (internal diameter) steel pipes; a) Determin...