4. A hydropower installation is to be located where the downstream water-surface elevation is 150 m below the water-surface elevation in the reservoir. The 1.5-m-diameter concrete-lined penstock is 300 m long and has an estimated roughness height of 17.5 mm (ks). When the flow rate through the system is 30 m3 /s, the combined head loss in the turbine and draft tube is 7.5 m, and the average velocity in the tailrace is 0.60 m/s. Estimate the power that can be extracted from the system.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, volleyballfun24
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
image
Engineering, 04.07.2019 18:10, nandalabella06
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
You know the right answer?
4. A hydropower installation is to be located where the downstream water-surface elevation is 150 m...

Questions in other subjects:

Konu
Computers and Technology, 01.07.2019 11:40