The following information is available for a company’s maintenance cost over the last seven months. Month Units Produced Maintenance Cost
June 90 $ 3,750
July 180 4,700
August 130 3,950
September 160 4,400
October 220 5,300
November 250 5,600
December 90 3,200

Using the high-low method, estimate both the fixed and variable components of its maintenance cost.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, BardiFan
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
image
Engineering, 04.07.2019 18:20, 1230bering
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
image
Engineering, 04.07.2019 19:20, rosemary909
In the winter, in order to keep the classroom steadily at 68 f before 10 pm, heating with an average rate of 42,000 btu/hr is provided. assume the outdoor temperature maintains at 32°f, determine the electrical power (kw) required to (a) operate a reversible heat pump (b) operate a real heat pump with a cop (7) of 4.5 and (c) operate an electrical-resistance heater.
Answers: 3
You know the right answer?
The following information is available for a company’s maintenance cost over the last seven months....

Questions in other subjects:

Konu
Mathematics, 10.12.2020 01:00
Konu
Physics, 10.12.2020 01:00