subject
Engineering, 07.04.2021 03:30 jaibean1202

1. Draw from memory a detail of a typical slab on grade and list the steps in its production. Why can't the surface be finished in one operation, instead of waiting for hours before final finishing?2. What are control joints and isolation joints? Explain the purpose and typical locations for each in a concrete slab.3. List the steps that are followed in forming and pouring a concrete wall.4. Distinguish one-way concrete framing systems from two-way systems. Are steel and wood framing systems one-way or two-way? Is one-way construction more efficientstructurally than two-way construction?5. List the common one-way and two-way concrete framing systems and indicate the possibilities and limitations of each.6. Why posttension a concrete structure rather than merely reinforce it?

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 19:10, alex6toes
What are the major differences between injection molding and extrusion?
Answers: 2
image
Engineering, 04.07.2019 19:10, justkevin1231
Which of the following is the most important advantage of a large field of view? a. allows larger areas to be examined b. relieves eyestrain c. minimizes parallax errors. d. increases precision in proportion to the in- crease in field of view
Answers: 2
image
Engineering, 04.07.2019 19:20, ijohnh14
Apure substance is a)-mixture of various chemical elements or compounds b)-substance that has a fixed chemical composition throughout c)-mixture that is homogeneous (such as air) d)-all the answers
Answers: 3
You know the right answer?
1. Draw from memory a detail of a typical slab on grade and list the steps in its production. Why ca...

Questions in other subjects: