subject
Engineering, 25.03.2021 22:40 hannahblank2466

For binary flash distillation, we discussed in class that there are 8 variables (F, ZA, V, ya, L, XA, P and T) and 4 equations derived from VLE and mass balances. Thus, we typically require 4 of these variables to be given so that we can obtain a unique solution to the problem. Let's say, your manager tells you that he has a feed mixture with 2 components (given F, za) and he requires you to come up with a flash column that can produce a certain desired amount of Vapor product (thus V, ya are specified). Identity of both components is known and all VLE data has been provided to you. Has the manager given you enough data? If yes, give a step-by-step description of how would you go about designing the flash column (basically find P and T)? If no, why?

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 23:20, abbz13
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
image
Engineering, 04.07.2019 18:10, soreese02
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 18:20, jessie8022
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
You know the right answer?
For binary flash distillation, we discussed in class that there are 8 variables (F, ZA, V, ya, L, XA...

Questions in other subjects:

Konu
Geography, 07.01.2020 03:31
Konu
Biology, 07.01.2020 03:31