Engineering, 22.03.2021 22:40 Crxymia
c) Estimate the activity duration if the contractor decides to excavate the layer by drilling and blasting. The site is 200 ft by 400 ft and must be excavated to an average depth of 14 ft. Trial blasting indicates that 3 in holes drilled in a 10 ft rectangular pattern will provide the desired fracturing. A hole depth of 16 ft must be drilled to yield a 14 ft effective depth. The average drilling and blasting rate is estimated to be 200 ft/hr.
Answers: 1
Engineering, 03.07.2019 14:10, BardiFan
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
Engineering, 04.07.2019 18:10, hadellolo8839
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
c) Estimate the activity duration if the contractor decides to excavate the layer by drilling and bl...
Social Studies, 19.09.2021 14:00
Advanced Placement (AP), 19.09.2021 14:00
Biology, 19.09.2021 14:00
Biology, 19.09.2021 14:00
Mathematics, 19.09.2021 14:00
Social Studies, 19.09.2021 14:00
English, 19.09.2021 14:00